13 Dewsbury Ter  -  July
Dewsbury Ter.   January 07  February 07  March 07  April 07  May 07  June 07  July 07 

1 Aug 2007 -Water Meter1 Augl 2007 - Water Line
August 1  -  Water and Other Utilities To the House

1 Augl 2007 - Utilities1 Augl 2007 - Water In House
Water Meter Installed and Line Under the House

1 Augl 2007 - Trench Elect, Tele, Cable1 Aug 2007 - Across Garage
Electrical, Telephone, and Cable From Boxes to House

1 Aug 2007 - Mail Post Wire1 Aug 2007 - Lite Scensor
Mailbox Post Light Wire From Sensor to Driveway

1 Aug 2007 - Electrical - Missed!1 Aug 2007 - Crossover
Oops, Electrical Missed a Little                                               Cable Crossover

1 Aug 2007 - Gas Crossover1 Aug 2007 - Sewer Crossover
Gas Line Crossover                             Sewer Line Crossover

1 Aug 2007 - Covered Up1 Aug 2007 - Filled In
August 2  -  Everything All Covered Up

1 Aug 2007 - Electrical Fixed2 Aug 2007 - Piller  Foot
Electrical Fixed                                      Pillar Still in Place

3 Aug 2007 - Fireplace3 Aug 2007 - Front Closet
       August 3  -  Fireplace Looking Good                    Coat Closet Door and Shelf

3 Aug 2007 - Masterbath Sinks3 Aug 2007 - MasterBath Closet
Master Bathroom Sinks Installed                               Closet Shelves Installed

3 Aug 2007 - MasterBath more Shelves3 Aug 2007 - Missing
       More Shelves in Small Closet                         Only thing Missing, Note Floor is Installed

3 Aug 2007 - Stove3 Aug 2007 - Ready for Fridge
Oven Almost Ready to Install                         Ready for Refrigerator

3 Aug 2007 - Kitchen Sinks3 Aug 2007 - Pantry
Kitchen Sinks and Knobs Installed                           Pantry Shelves

3 Aug 2007 - Bedroom 2 Shelf3 Aug 2007 - Bedroom 3 Shelf
Both Extra Bedrooms have Shelves and Mirror Doors Hung

3 Aug 2007 - Hall Fire Detector3 Aug 2007 - Guest Bath
                                  Fire Detector in Hall                              Guest Bath Just About Finished

9 Aug 2007 -9 Aug 2007 - Greatroom Fan Lights
August 9  -  Piller Painted to Match Walls                                       Ceiling Fan and Lights           

9 Aug 2007 - Sunroom Light9 Aug 2007 - Whew Hot Day
Sun room Fan/Light                                                 Thermostat Installed

9 Aug 2007 - Kitchen Light9 Aug 2007 - Microwave
Kitchen Lights                                                                               Microwave

9 Aug 2007 - Dedroom 29 Aug 2007 - Bedroom 3
Bedroom Fans/Lights

9 Aug 2007 - Guest Bath9 Aug 2007 - Guest Bath9 Aug 2007 - Masterbath 2
Bathroom Mirrors, Lights, and Last Commode Installed

9 Aug 2007 - Mailbox9 Aug 2007 - Front Porch Lights
Mailbox and Light Installed                                              Front Porch Lights

10 Aug 2007 - Front Porch Rails
Front Porch Lookin' Good

16 Aug 2007 - No Piller16 Aug 2007 - Piller Memory
August 16  -  The Piller is just a memory now!

16 Aug 2007 - Cable Plug16 Aug 2007 - Phone Plug
Cable TV Plugs Installed                                         Phone Plugs Installed

16 Aug 2007 - Sound Still to Come16 Aug 2007 - Sound Wires
Sound System Wires Still Need Work

16 Aug 2007 -  Grinder Light16 Aug 2007 - Towel Rack
Grinder Pump Warning Light, Oops Switch Plate Adjustment                Master Bathroom Towel Rack          

16 Aug 2007 - Water Heater16 Aug 2007 - Water Connected
Water Heater Installed                                                Water Connected and On

16 Aug 2007 - Front Porch
Front Porch

17 Aug 2007 - Great Room with Carpet17 Aug 2007 - Piller No More
August 17  -  Carpet Installed Today                                             Piller Footprint Repair          

17 Aug - Master Bedroom17 Aug 2007 - Bedroom 2
Master Bedroom with Carpet                                                  Front Bedroom      

24 Aug 2007 - Driveway almost ready24 Aug 2007 - Front walk forms
Grading for Driveway Almost Done                                   Front Walk Forms in Place

24 Aug 2007 - Grinder Light Wired24 Aug 2007 - Air Unit
Grinder Pump Warning Light Wired                          Air Exchange Unit Excessive Condensation

24 Aug 2007 - Sound Controls Missing24 Aug 2007 - No Speakers
Sound System Controls and Speakers All That is Left For Electrical Upper Level

24 Aug 2007 - Stairway Pad24 Aug 2007 - Lower Door Pad
Pads at the Bottom of Deck Stairs and Entrance of Lower Level

24 Aug 2007 - New Platform in Lower Level24 Aug 2007 - New Platform Lower Level
New Storage Platform in Lower Level

28 Aug 2007 - Driveway28 Aug 2007 - Front Steps
August 28  -  Half the Driveway Done                             Forms in Place for Front Walk and Steps

30 Aug 2007 - Finished Driveway30 Aug 2007 - Finished Walkway
August 30  -  Driveway and Walkway Finished



Home   January 07  February 07  March 07  April 07  May 07  June 07  July 07